Business

Rocket Lab raised Neutron’s price to $70 million before the rocket has ever flown

Rocket Lab's launch backlog hit a record 117 missions and it is buying Iridium for about $8 billion, while investors weigh ongoing losses and a first flight now pushed to 2027
Victor Maslow
Add us on Google

For most of the commercial space era, the scarce thing was customers. Launch companies cut prices, sold rideshare slots and chased anyone with a satellite and a budget. Rocket Lab’s latest results suggest that relationship has flipped: the company is raising the price of a rocket that has never left the ground, and satellite operators are signing anyway.

That rocket is Neutron, the reusable medium-lift vehicle Rocket Lab is building to compete in the workhorse class of launcher that SpaceX dominates. It has no flight history, no proven reuse record and a debut that has slipped again. Rocket Lab told investors that buyers are committing anyway because the industry is running short of rides to orbit, and it is pricing accordingly.

Neutron has a waiting list before its first flight

In its third-quarter report, Rocket Lab said it signed more than $515 million in Neutron launch contracts with constellation operators, taking the rocket’s backlog to 16 missions before its first flight. For several of those missions the base launch price rose to $70 million, which the company tied directly to tightening launch capacity across the industry. First launch is now targeted for no earlier than 2027, with flight hardware being delivered to Launch Complex 3 in Virginia.

Paying a premium for an untested vehicle says a lot about the alternatives. Operators building broadband and direct-to-device networks need dozens of launches on a predictable schedule. The dominant provider also runs its own competing constellation, Starlink, and the list of other medium-lift options is short. A booked slot on a rocket that might arrive late can still be worth more than no slot at all.

Most of Rocket Lab’s revenue already comes from satellites, not rockets

Launch is the visible piece of the business, but most of Rocket Lab’s revenue now comes from building the hardware that rides on top. Product revenue, mostly spacecraft and components, made up $197.5 million of the quarter’s record $268 million, against $70.3 million from launch and other services. Twelve Rocket Lab-built spacecraft reached orbit during the period, including eight platforms for Globalstar’s direct-to-device constellation and twin spacecraft doing Mars science for NASA. The company says more than 55 more are in development.

Founder and chief executive Peter Beck framed it as the payoff of an “end-to-end space strategy”, saying the most ambitious missions “increasingly rely on Rocket Lab for launch, spacecraft, and components, sometimes all on a single mission.”

The pending acquisition of Iridium Communications, the satellite phone and data operator, pushes that logic further. Rocket Lab agreed in June to buy Iridium for $54 a share in cash and stock, valuing the company at about $8 billion including debt. Rocket Lab says the deal is now fully funded through an at-the-market share sale, Iridium’s lenders have agreed to keep its credit facility in place, and Iridium shareholders have voted in favor. Closing is expected in mid-2027, subject to regulatory clearances. A company that builds rockets, builds satellites and owns a working satellite network looks less like a launch provider and more like a smaller, vertically integrated rival to the incumbents.

Barclays likes the industrial story, but losses remain

Barclays initiated coverage of Rocket Lab in October with an Overweight rating and an $85 price target, as part of a broader aerospace and defense review that favored emerging defense technology companies over legacy prime contractors, according to a summary published by Insider Monkey on Yahoo Finance. The bank described the US as being in the early stages of a modern industrial transformation. Rocket Lab’s order book fits that framing: alongside commercial operators, its spacecraft pipeline includes work for NASA, the Space Development Agency and the US Space Force.

The skeptic’s case is just as concrete. Rocket Lab still loses money on an adjusted basis and guided to an adjusted EBITDA loss of $14 million to $20 million for the fourth quarter. The Iridium deal adds integration work to a company that has yet to fly its biggest product. The shares closed at $49.63 on Monday and fell about 7% on Tuesday, as technology stocks stayed under pressure after their worst week since early 2020.

A $3.6 billion backlog and record launch bookings

Total backlog reached about $3.57 billion at the end of September, up 52% from the end of June. Nearly $1 billion of new launch contracts across Electron, HASTE and Neutron were signed in the quarter alone, along with $470 million in Space Systems deals, and the launch backlog stands at a record 117 missions. Rocket Lab held $4.45 billion in cash and equivalents and reported positive GAAP operating cash flow of $7.2 million. For the fourth quarter it guided to revenue of $270 million to $290 million and a non-GAAP gross margin of 39% to 41%, up from 38.4% in the third quarter.

Neutron’s first customers are paying a scarcity premium for a promise. If the rocket flies in 2027 and keeps flying, a $70 million ticket will look cheap. If it slips again, those 16 missions become the most expensive waiting list in the launch business.

Tags: , , , , ,

Add us on Google

Discussion

There are 0 comments.